[edit] Introduction
It is commonplace for clients to ask their builder to use a trade contractor with whom they have an established relationship, and to allow that trade contractor to purchase their own materials, supplies, and surface protection.
Homeowners commonly do this to establish an apparent environment of accountability and trust. However, this can be a detriment to the building process. Builders purchase from their suppliers and select subcontractors based upon positive lessons learned through prior experience, as a builder's reputation is vital to maintaining ongoing success. Allowing the builder to use familiar subcontractors and suppliers can be in the best interest of the homeowner.
[edit] Purchasing from experienced and reliable suppliers
Allowing a builder to purchase from previously tried and tested suppliers provides assurance that all products are reliable, consistent, dependable, and pose no threat of damage to a client's home. Builders use established suppliers precisely because they can stand behind the reliability and dependability of the purchased products, and because they truly feel that using these products is in the best interests of the homeowner.
What good is protecting a newly-installed carpet with cut-rate temporary carpet film when it leaves a residue on the new carpet? The extra cost spent cleaning the carpet is significantly more than the price savings.
In an effort to save on material costs, homeowners will frequently look online and look towards multiple suppliers to provide necessary fixtures for their homes. People are frequently unaware of the intricacies and the risks involved through sourcing their own products. It is commonplace that small parts of plumbing fixtures, lighting arrangements, etc. need to be ordered separately.
In addition to creating time delays, this may pose a risk that the ordered products fail to meet the needs of the project, resulting in breakage and even damage to a home. If in an attempt to save a little bit on a remodel, a homeowner may inadvertently order a sink that fails to meet the water pressure limits of a home, this can result in flooding damage that may not be covered by warranties. The best way to minimise any risk in a home remodel can be to allow the builder to purchase from proven suppliers.
[edit] Builder-selected subcontractors
There are even more compelling reasons for using regular subcontractors. Builders depend on subcontractors as much as they depend on employees - trade partners are an integral part of the builder's team. Thus, builders tend to award major contracts (the wiring of a custom home, for instance) only to subcontractors that have proven themselves. With proven trades, accurate bids can be assembled quickly, and the builder understands and trusts the quality promised by those bids.
Builders often evaluate subcontractors over the course of years. Subcontractors are initially placed to complete small jobs to evaluate their abilities. Even once a subcontractor has demonstrated their ability, they are still evaluated on metrics such as how available for contact they are, how accurate their bids are, how well they work with the customer and the builder, and how their work holds together over a period of years. Further, allowing the builder to choose subcontractors allows both the sub and the builder to coordinate on efforts such as using temporary surface protection to protect the home from dust and damage.
Ultimately, it is in a subcontractor's interest to complete the work as well as possible. Completing projects in a professional and attentive manner ensures future work for the subcontractor. A builder that uses an untested subcontractor risks losing control over the quality of the building. As such, any problems caused by painters, contractors, and products bought by the customer cannot be prevented by the builder's due diligence.
Perhaps the painter suggested by the homeowner failed to protect the newly installed wood floor from paint splatter resulting in costly resurfacing. Any of these problems will reflect poorly on a builder's reputation, and a builder's reputation is the basis for earning future work.
Builders prefer purchasing from certain suppliers and use specific subcontractors because they believe it is in the best interest of the homeowner.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.